Linley Valley Pork

Proven performance sees Fosroc's Nitoflor PU600 with Nitoflor PU200 polyurethane cement solution specified again at Linley Valley Pork.

 

Nickel Concentrator

A concrete column supporting the sag mill was in need of significant repairs. Being in the acid splash zone, there was significant concrete contamination and re-bar damage, more than 20% of the steel reinforcement had to be replaced.

Cape Naturaliste Lighthouse

Cape Naturaliste Lighthouse in South West WA is exposed to the elements in a highly corrosive environment.  Fosroc ANZ provided a comprehensive concrete repair system for the entire building inside and out, and a non-slip waterproofing solution fo...

Embassy Floors

At one of Canberra's diplomatic embassies, 30 years of wear and tear had left the basement and plant room floors in urgent need of repair. The busy floors needed a tough coating solution with a non-slip surface.

Newcrest Mining Bund Remedial Works

At one of the largest gold mines in Australia, acid used in the elution process had led to significant concrete erosion and steel corrosion.  Fosroc's specification delivered a comprehensive repair with multiple layers of long-term protection built in, for both steel and concrete.

Kirribilli Harbourside Carpark

Over 24,000 litres of Fosroc Renderoc HB40 Plus provided a concrete remediation solution to revitalise this carpark and ensure its safety for drivers and vehicles for years to come. To complete the solution, Dekguard S was applied over the entire soffit area for corrosion protection and Nitoproof 510 was used on the...